Progress has been steady and now the block, gearbox and driveshafts are in!
The brakes have been overhauled including new wheel cylinders and shoes, new brake hoses and 2 new brake pipes. The master cylinder has been rekitted and the system bleed of air.
The Clutch slave cylinder and master cylinder have been rekitted and with the new clutch plate it feels good so far..
The fuel tank is now in and we are just chasing some 5/16 fuel hose and we can finish the engine side of things..
The engine has had all seals and gaskets replaced. The bearings were inspected and in good looking condition. The head has been tided up with new valve stem seals and cleaned and lapped in valves.
It is fully reassembled and ready to go when the fuel and radiator is installed...